Inside the workshop
One roof,
2,800 square metres.
Spinning, polishing, crystal stringing, assembly and packing under one roof in Henglan, Zhongshan — the lighting cluster that has supplied the trade for thirty years.
since 2013
Henglan, Zhongshan
at full load
after deposit
The floor
Four processes,
no subcontractor.
Most lighting “factories” assemble and outsource the rest. We keep the four processes that decide quality and lead time in-house, which is why we can promise a date and hold it.
- Aluminium spinning and extrusion, 12 stations
- Polishing, plating and powder coating line
- Crystal cutting, drilling and hand stringing
- Assembly, burn-in and packing on site
Capabilities
What the building
can actually do.
Spinning & extrusion
Rings up to Ø1800 mm spun in-house. Extruded profiles cut, mitred and welded on jigs.
Plating & coating
Brass, nickel, chrome and powder coat. Salt-spray tested to 48 hours on request.
Crystal work
K9 blanks cut, drilled and strung by hand. Strand length set per drawing, not per batch.
Glass
Hand-blown opal and clear glass from two partner workshops within 20 km, both audited annually.
Electrics
110 V and 220 V builds, integrated LED, DALI and 0–10 V dimming, drivers from named brands.
Packing
In-house carton printing, foam cutting and drop testing. Retail-ready labelling on the same line.
Quality control
Every unit runs
four hours.
A chandelier that flickers on installation costs more than the fixture. Every unit is burned in before it is packed, and the result is logged against the order number.
- Incoming inspection on brass, crystal and drivers
- In-process check after polishing and wiring
- 4-hour burn-in with dimming cycle
- Final visual check under 3000 K and daylight
- Carton drop test, 1.2 m, three orientations
Compliance
Documents that
clear customs.
Test reports are issued in the name of your company where the standard allows it, so the file matches the importer of record.
| Market | Standard | Status | Issued by |
|---|---|---|---|
| European Union | CE · RoHS · ERP | Component certificates (driver, wiring, lampholder) + our Declaration of Conformity | Components + BISBOKE |
| North America | ETL / UL 1598 | Whole-fixture test on request, 7–10 days | Intertek / TÜV |
| Australia | SAA / RCM | Whole-fixture test on request, 7–10 days | SAA-approved lab |
| Saudi Arabia | SASO · SABER | On request, 10–15 days | Approved body |
| United Kingdom | UKCA | On request, 7–10 days | Third-party lab |
CE and RoHS are declared at fixture level on the basis of component certificates and our own declaration of conformity. ETL, UL, SAA, SASO and UKCA require whole-fixture testing by a third-party laboratory — we quote and schedule that per project, with the report issued in your company’s name.
Visit