OEM / ODM · Factory direct Zhongshan, China

Inside the workshop

One roof,
2,800 square metres.

Spinning, polishing, crystal stringing, assembly and packing under one roof in Henglan, Zhongshan — the lighting cluster that has supplied the trade for thirty years.

13 yrs
Manufacturing
since 2013
2,800 m²
Production floor
Henglan, Zhongshan
5,000 pcs
Monthly capacity
at full load
15–25 days
Typical lead time
after deposit
Factory floor with assembly lines and hanging linear lights

The floor

Four processes,
no subcontractor.

Most lighting “factories” assemble and outsource the rest. We keep the four processes that decide quality and lead time in-house, which is why we can promise a date and hold it.

  • Aluminium spinning and extrusion, 12 stations
  • Polishing, plating and powder coating line
  • Crystal cutting, drilling and hand stringing
  • Assembly, burn-in and packing on site

Capabilities

What the building
can actually do.

Spinning & extrusion

Rings up to Ø1800 mm spun in-house. Extruded profiles cut, mitred and welded on jigs.

Plating & coating

Brass, nickel, chrome and powder coat. Salt-spray tested to 48 hours on request.

Crystal work

K9 blanks cut, drilled and strung by hand. Strand length set per drawing, not per batch.

Glass

Hand-blown opal and clear glass from two partner workshops within 20 km, both audited annually.

Electrics

110 V and 220 V builds, integrated LED, DALI and 0–10 V dimming, drivers from named brands.

Packing

In-house carton printing, foam cutting and drop testing. Retail-ready labelling on the same line.

Hotel suite lit by wall sconces and a globe pendant

Quality control

Every unit runs
four hours.

A chandelier that flickers on installation costs more than the fixture. Every unit is burned in before it is packed, and the result is logged against the order number.

  • Incoming inspection on brass, crystal and drivers
  • In-process check after polishing and wiring
  • 4-hour burn-in with dimming cycle
  • Final visual check under 3000 K and daylight
  • Carton drop test, 1.2 m, three orientations

Compliance

Documents that
clear customs.

Test reports are issued in the name of your company where the standard allows it, so the file matches the importer of record.

MarketStandardStatusIssued by
European UnionCE · RoHS · ERPComponent certificates (driver, wiring, lampholder) + our Declaration of ConformityComponents + BISBOKE
North AmericaETL / UL 1598Whole-fixture test on request, 7–10 daysIntertek / TÜV
AustraliaSAA / RCMWhole-fixture test on request, 7–10 daysSAA-approved lab
Saudi ArabiaSASO · SABEROn request, 10–15 daysApproved body
United KingdomUKCAOn request, 7–10 daysThird-party lab

CE and RoHS are declared at fixture level on the basis of component certificates and our own declaration of conformity. ETL, UL, SAA, SASO and UKCA require whole-fixture testing by a third-party laboratory — we quote and schedule that per project, with the report issued in your company’s name.

CERoHSETL / UL on requestSAA on request

Visit

Come and audit
the floor yourself.